Loading Please Wait
Loading Please Wait
The gymnatorium roof, which has a span of 7 1'0", was designed as "one list" with 4'0" high prestressed upstand concrete beams. An 8" slab from beam to beam with Durisol slabs provides a flat acoustically treated ceiling. The classroom wing was also lift-slab construction and was finished for occupation before the completion of the remainder of the building. Cost was $11.91 a square foot and the building was completed in September 1957.