Loading Please Wait
Loading Please Wait
The original east building was constructed in 1886. From the TDSB´s publication at the opening of the new wing: Annette Street Public School. JS & SS General Data 1962 This project consisted of a large new addition attached to the existing building at the west end and a complete interior renovation of the existing school built in 1911. The basic construction of the new addition is precast reinforced concrete frame, precast concrete floor and roof slabs in the classroom block, reinforced concrete vaulted roof in the gymnasium, masonry walls, and metal window frames generally. Interior finishes are terrazzo floors in the corridors and washrooms; classrooms have vinyl asbestos floor tiles, exposed concrete ceilings and slag block walls painted. The double gymnasium has a maple door and an electrically operated folding door to divide the area into boys’ and girls’ gymnasia. New building has a dual duct high velocity heating and ventilation system for the classrooms, administrative and cafeteria areas, all temperature controlled.
High Park Alternative School, founded in 1981, is housed in the Annette Street Public School complex in the Bloor West/Junction/High Park community.
________________________________
My father, Wallace MacGregor was the Masson who built the beautiful brick lattice work over the music room windows.
Robert MacGregor